Step 1: Place your watch holder in the desired location on the front deck of your boat
Step 2: Place each of the three loose additional magnets (provided in the zip lock bag) under the deck so the magnets attract to the three magnets fixed in the water holder
Step 3: with the boat well support and off the ground, carefully place the boat upside down without disturbing the position of the watch holder
Step 4: If the fitting kit was purchased on order. Mix equal amounts of the hardener and the resin together until a sticky paste has formed
Step 5: Before applying glue, thoroughly dry the inside of the boat. Use a lollipop sticky and carefully spread the glue on and around all three magnets equally
Step 6: Leave the boat for half an hour to set
Note: If glue was not purchased on order, araldite glue is recommended for gluing the additional magnets into your boat. It is recommended you dry your watch holder after use to prevent rust on the magnets in your watch holder
On order of handles you receive 2x handles, fittings and a to size fitting application paper with all the steps and measurements for the application of the handles.
